Vitalik Buterin warns against rushing Ethereum gas change that could break some contracts
Ethereum co-founder Vitalik Buterin has warned against rushing the Glamsterdam upgrade because its new gas rules could break some existing smart contracts. Developers are targeting Dec. 15 for a testnet activation.
In a Nov. 28 post on X, Buterin acknowledged that complaints about Ethereum Improvement Proposal (EIP) 8037 breaking existing smart contracts were valid, even though he considered the changes necessary for Ethereum's long-term sustainability.
Buterin argued that changes to fundamental aspects of the blockchain could undermine confidence in immutable smart contracts by encouraging application developers to give administrators greater control over deployed code.
He said:
"We do NOT want an Ethereum where it becomes 'prudent security advice' to have centralized upgrade hatches 'just in case'."
The Ethereum co-founder urged core developers to assume responsibility for supporting applications disrupted by network upgrades. He also called on the Ethereum Foundation, Ethlabs and other ecosystem organizations to expand their efforts to help affected developers.
Buterin added:
"Given its breaking nature, Glamsterdam should not be rushed."
At their Nov. 26 meeting, Ethereum core developers agreed to keep Glamsterdam's existing gas pricing rules and targeted Dec. 15 at 19:12 UTC for activation on the Hoodi testnet.
The decision followed weeks of deliberations after the Ethereum Foundation postponed the Oct. 26 Hoodi test over smart contract compatibility concerns.
During the Nov. 26 meeting, execution-layer client teams declined to block the existing specifications despite lingering reservations. Consensus-layer developers also settled on a solution for validating block builders' execution payloads, clearing another technical obstacle to the Hoodi deployment.
Client teams are targeting software releases for the week beginning Nov. 30, ahead of Glamsterdam's final public testnet activation.
Ethereum's push toward 80 transactions per second
Glamsterdam represents a major step in Ethereum's ambition to expand its base-layer capacity following the Fusaka upgrade.
The upgrade changes how Ethereum constructs and validates blocks and lays the groundwork for parallel transaction processing and a 200 million block gas limit, up from 60 million.
Blockchain analytics platform Growthepie estimates that the increase could raise Ethereum's layer-1 throughput from 24.9 transactions per second (TPS) to approximately 80 TPS in early 2027.
That additional capacity could allow Ethereum to accommodate substantially more decentralized finance activity, stablecoin payments, and institutional settlements directly on its mainnet.
However, expanding the gas limit without changing how Ethereum prices network resources could accelerate the growth of its permanent database, increasing hardware requirements for node operators.
EIP-8037 addresses this problem by raising the gas cost of creating new accounts, storage entries, and smart contract code. A related proposal, EIP-8038, adjusts the cost of accessing existing network state.
The changes could cause some smart contracts to exhaust gas allowances that previously covered their operations.
A Nov. 18 impact assessment by ChainSecurity, alongside investigations coordinated by the Ethereum Foundation, documented 200 compatibility findings, including three classified as high severity.
The affected systems include bridges, wallets, exchanges, staking protocols, and governance mechanisms, with potential consequences ranging from interrupted operations to locked funds and incorrect reward calculations.
While configuration changes can resolve most findings, 24 require contract upgrades or migrations.
On Nov. 25, Ethereum research organization Ethlabs recommended retaining Glamsterdam's existing specifications, arguing that removing EIP-8037 would sacrifice the planned threefold increase in the gas limit.
The organization added that modifying the proposal would resolve only some compatibility issues while introducing several months of additional development work.
Meanwhile, the Ethereum Foundation and its research partners have contacted more than 50 affected companies to coordinate remediation efforts.
According to Ethereum Institutional, the most severely affected projects have either implemented fixes or expect to complete them by mid-December, while others expect to be ready by Jan. 10.
Developers have identified mid-January 2027 as the earliest possible Glamsterdam mainnet window, although late January or early February appears more realistic. No mainnet activation date has been agreed upon.
-- Price
This content is provided for general informational purposes only and doesn't constitute financial, investment, legal, or tax advice. Any events, rewards, online promotions, or related information mentioned herein should not be considered a recommendation, solicitation, or invitation to purchase, sell, trade, or otherwise deal in any crypto assets. Crypto assets are highly volatile and may result in loss. The availability of WEEX services, products, and related events may vary by region. You are responsible for ensuring that your participation is in accordance with applicable local laws and regulations.
You may also like

The Best Natural Gas Stocks to Buy and Hold Through 2040

BNB Chain’s new blockchain could make the same PancakeSwap trade 27% more expensive

Black Friday Stock Deals: 7 Bargains Our Analysts Are Watching Now

CAC 40 Forecast for December 2026: Can the Rally Last?

Qatar Increases LNG Exports via the Strait of Hormuz, Reducing Costs for Bangladesh

Philippine Central Bank Expects November Inflation Rate to be Between 7.2% and 8.2%

LambdaClass Compares Four Quantum-Resistant Signature Schemes for Ethereum, Recommends Hegotá to Launch Quantum-Resistant Authorization

Ethereum Glamsterdam Update Scheduled for December 15

From Bear Market Low to Renaissance: Yuxin Instant Pig Visits Huobi's Celebrity Lecture Hall to Interpret Ethereum's Breakthrough Path

Ethereum Breaks Key Resistance: Is the Worst Phase of the Sell-off Over?

Real Stock Price at $28, Soared to $132 on Chain: How to Fix the RWA Pricing Flaw?

Critical Decision on Ethereum: Thousands of Smart Contracts at Risk

Demand for Copper and Aluminum Driven by New Energy and Artificial Intelligence Industries, Industrial Enterprises' Profits Increase by 4.6%

Profits in Computer, Communication, and Other Electronic Equipment Manufacturing Increased by 1.0 Times from January to October

Attack on Saudi Jizan Oil Refinery, OPEC+ Plans to Extend Quotas, Brent Oil Returns to $96

Tokyo Inflation Rises to 2.9%, Expectations for BOJ Rate Hike Increase

Semiconductor Sales Will Soar to $2.6 Trillion in 2027. Buy This Top Stock Before It Skyrockets Next Year

Yuxin: Vitalik Becomes More Commercialized, ETH Returns to Value Storage

Qatar's LNG Exports Reach Record High

Record Daily Gas Extraction from European Underground Storage Facilities

Investment Cooperation in the Energy Sector of the Belt and Road Initiative Exceeds 3.33 Trillion Yuan

French Industrial Producer Prices Rose 9.6% Year-on-Year in October, Driven by Soaring Energy Prices

Australia's Q3 Business Capital Expenditure Grows 12.2% Quarter-on-Quarter

Amazon Is Backing More Than 5 Gigawatts of New Nuclear by 2039. This Reactor Developer Could Cash In.

AI Bonds Have Dropped to Cheap Enough Levels: DoubleLine's Cohen Shifts from Bearish to Buy

UAE Restricts Tankers from Entering Major Oil and Gas Export Hubs

The AI Power Surge Returns to Rationality: Where to Find Valuation Lows

Prediction: Micron Stock Will Be at This Price at the End of 2027

Japan Considers Establishing Stable Supply System for Chips and Materials







